 |
Completed all the drilling of holes in the baggage areas
|
 |
Drilled the holes required in the side skins to take cables to the
wings
|
 |
Drilled fuel line holes
|
 |
Took
it all apart again :-)
|
 |
Deburred all the holes
|
 |
Edge
smoothed all the components
|
 |
Huge
amount of countersinking
|
 |
Huge
amount of dimpling
|
 |
All
components primed
|
 |
Aircraft reassembled and made sure it was level and straight
|